GH REAL TIME - Are you ready to take crane maintenance up to the next level?
Thanks to the GH configurator, app and Corebox.
We connect machines, data and people, making it possible to control the life cycle of cranes in real time.
follow us on
Video of the Port of Caleta de Vélez
Video of the Port of Caleta de Vélez.
AW3000 maximum efficiency winds power in Brazil
AW3000 maximum efficiency winds power in Brazil.
Industrial Center Ternium
This steel complex is the most advanced of all Latin America for its technology, automotive level and environmental impact.
Double girder EOT crane's load tests for GARCIA, S.A. in Viana do Castelo
Installation in GARCIA, GARCIA, S.A. in Viana do Castelo (Portugal), of a double girder EOT crane with two hoists of 40/40t of lifting capacity, 10 metres of lifting height and 24,30 metres of crane span.
Megarob project
Making the future with next-generation industrial robotics.