With the use of the GH CRANES & COMPONENTS gantry cranes the prefabricated concrete voussoirs are transported into the tunnel. The three tunnelling machines that are operating carry out the task of lining the tunnel with the voussoirs.
follow us on
ACCIONA Infrastructures corporative video
ACCIONA Infrastructures corporative video, where we can see a gantry crane from GH.
Second video of Alstom plant in Saint-Nazaire (France)
Saint-Nazaire: The first production plants offshore wind turbines in France.
ACCIONA Windpower AW3000 Turbines at the Pioneer Grove Wind Farm
ACCIONA Windpower's Pioneer Grove Wind Farm is the first installation of the AW3000 turbine in North America.
Video of Alstom plant in Saint-Nazaire (France)
Saint-Nazaire: The first production plants offshore wind turbines in France.
Video of installation plant Ternium Siderar, Argentina
Plant installation at Siderar, San Nicolás, Buenos Aires.